|
Build Your Online Product Catalogs?
Product Name: |
Transformer Station Test Van
|
Supply Ability: |
ISO IEC |
Related proudcts |
transformer, high voltage, test, |
Specifications |
GS 90 Integrated Transformer Station Test Van |
Price Term: |
FOB |
Port of loading: |
seaport |
Minimum Order |
1 |
Unit Price: |
negotiable |
|
Put all the test units in the van working platform.
Every test unit has own functions and can be developed separately. But it is controlled by central software.
Every test unit is designed according to working habits and environment to reach light and co***ct. Every unit is a module and can be developed separately.
All the units are designed according to IEC 61850 and und the communication system of industrial Ethernet. So it's easily to be expended.
All the process control and data analyzing are done by central software according to IEC 61850.
Integrating all the supporting units for all the test units, we built a powerful supporting system for all the test units.
Our test van is reliable, comfortable and particle
All the test units are designed and checked under vibration conditions.
Failure insulation: All the test units work separately. When one test unit is wrong, the other test units can work without any problem.
Long distance tests: All the test units are designed with 30M long connection wire. We secure the anti-interference and precision of test data. The test unit can be took out and works as a sensor to get back the data, when the test van cannot reach the test site.
Easy maintenance and improvement: It's easy to maintain and improve.
Safety
The test van is designed strictly according to Chinese standards and IEC standards.
All the wrong and unsafe operations are not accepted by our software. Monitoring and communication: The personnel in test van can see the site by our monitor system and can communicate with the personnel outside the test van. The Led panel outside the test van shows the condition of test. The personnel outside the test van know all.
Tests in complete examination and repairing of transformer station; Tests in running condition.
The tests of switch, DC resistance, turn ratio and short circuit impedance can be done in one time after wire connections. The tests of C & Tan Delta for all the windings and bushings can be done in one time.
|
Company: |
GAUSS HV ELECTRIC CO., LTD
|
Contact: |
Mr. Kevin Pu |
Address: |
Room 819, No.15,Lane 201,Jinxiang Road,Pudong (201206), Shanghai, China |
Postcode: |
200000 |
Tel: |
86-21-50753359 |
Fax: |
86-21-33901039 |
E-mail: |
|
|
|
|